Open Issues Need Help
View All on GitHub C4 to C5 Upgrade Path Clarification Needed about 1 month ago
AI Summary: The task involves clarifying the upgrade path from a Wazo C4 installation (lacking Asterisk and key C5 components) to a full C5 platform. The project README suggests a simple C5 feature enablement, but the current setup is purely C4. The solution requires determining whether to deploy a separate C5 stack alongside the existing C4, use an alternative docker-compose file, or migrate directly to ASTPP v6. The core issue is the discrepancy between the project's description and the actual existing infrastructure.
Complexity:
4/5
help wanted question